New Mexico Department of Transportation
New Mexico Road Conditions - Home Road Advisory Hotline - 1.800.432.4269 Friday, November 20, 2009

 
     
RSS 2.0 Feed
All Current Incidents
Roadwork Roadwork -

Eastbound and Westbound from mile marker 102 to mile marker 102 at Sky City Casino.

Title: Eastbound and Westbound from mile marker 102 to mile marker 102 at Sky City Casino.
Description: I 40, Exit 102 (at Sky City Casino) reduced to one in each direction at the interchange. Speed is reduced to 55 mph through the work zone. EASTBOUND LANE RESTRICTED TO 10 FEET. ALL OVERSIZE LOADS MUST USE EXIT 102 INTERCHANGE. SP 130 Spur at Exit 100 Interchange. Truck traffic present on NM 124 and NM 124 Spur. All work will be performed from 7am to 5 pm Monday through Friday. Please drive with caution, reduce your speed and obey all posted traffic signs.

last updated 2009-11-20 07:56:23.883 MST

Roadwork Roadwork - I 10

Interstate 10 Eastbound and Westbound from mile marker 34 to mile marker 105.

Title: Interstate 10 Eastbound and Westbound from mile marker 34 to mile marker 105.
Description: The NMDOT will be installing raised pavement markers along I10 between Akela and Lordsburg, please use caution as you will experience lane drops and reduction in speed.

last updated 2009-11-16 15:17:12.913 MST

Roadwork Roadwork - I 25

Interstate 25 2 miles East of Lemitar at mile marker 156.

Title: Interstate 25 2 miles East of Lemitar at mile marker 156.
Description: Bridge work on frontage road east of I25 in Lemitar, please continue to follow detours.

last updated 2009-11-20 13:31:04.373 MST

Alert Alert - I 25

Interstate 25 Southbound from mile marker 1 to mile marker 1 at University Exit.

Title: Interstate 25 Southbound from mile marker 1 to mile marker 1 at University Exit.
Description: University exit will experience back up with traffic for those entering in off I25, please use caution.

last updated 2009-11-12 08:08:43.687 MST

Roadwork Roadwork - I 25

Interstate 25 Eastbound at Lohman and Telshor.

Title: Interstate 25 Eastbound at Lohman and Telshor.
Description: Lohman and Telshor will experience lane closures and reduction in speed as the contractor works on wideing the road. Please use caution, questions can be adddressed to the City of Las Cruces.

last updated 2009-11-16 15:17:37.163 MST

Seasonal Closure Seasonal Closure - NM 159

New Mexico 1_59 from mile marker 0 to mile marker 25.

Title: New Mexico 1_59 from mile marker 0 to mile marker 25.
Description: NM159 Closed for the winter due to difficult driving conditions, roadway scheduled to be opened in early spring 2010.

last updated 2009-11-17 16:14:35.983 MST

Roadwork Roadwork - NM 273

New Mexico 2_73 Northbound and Southbound from mile marker 5 to mile marker 9 at mile marker 5.

Title: New Mexico 2_73 Northbound and Southbound from mile marker 5 to mile marker 9 at mile marker 5.
Description: Motorists traveling in the Sunland Park area on NM273 will experience lane drops with reduction in speed as work continues along the project. Please use caution and contact the NMDOT for questions regarding this project.

last updated 2009-11-16 15:17:29.583 MST

Roadwork Roadwork - NM 83

New Mexico 83 Eastbound and Westbound from mile marker 2 to mile marker 12 at Country Club Road.

Title: New Mexico 83 Eastbound and Westbound from mile marker 2 to mile marker 12 at Country Club Road.
Description: Traffic is now 4 lane from the start of the Project to Country Club Road. Two way Traffic form Country club.Detour in place at Mile Post 5. Posted Speed 25MPH. Expected completion in Spring 2010. NMDOT Project Manager Richard Gonzales 575-626-9875, or NMDOT Assistant Project Manager Jeff Hatch 575-626-8217. Contractor Emergency Contact is Shane Timms 575-602-3802.

last updated 2009-11-12 14:29:22.390 MST

Roadwork Roadwork - NM 128

New Mexico 1_28 Eastbound and Westbound from 38 to 49 at Lea County.

Title: New Mexico 1_28 Eastbound and Westbound from 38 to 49 at Lea County.
Description: No interruption to traffic flow at this time. Heavy equipment is present. The travelling public is urged to pay close attention to traffic control and signs. Emergency Numbers: NDMOT Project Manager Cecil Pendergrass, (575) 626-9874; Contractor James Hamilton Construction -Jim Bauer, Project Supt (575)538-1779; Joseph Chermiah, Proj. Safety Officer (575) 388-7543

last updated 2009-11-06 07:49:10.67 MST

Roadwork Roadwork - NM 128

New Mexico 1_28 Eastbound and Westbound from 24 to 38.

Title: New Mexico 1_28 Eastbound and Westbound from 24 to 38.
Description: Construction taking place along side of existing Roadway. Occasional interruption to travelling public will have traffic control with barrels and pilot car. Fines double within the construction zone. Travelling public urged to pay close attention to on-going construction and traffic speed limits. Estimated Completion Date on this project is June of 2010. Emergency Contacts:NMDOT Cecil Pendergrass, Project Manager (575) 626-9874; Nathan Palomarez, NMDOT Lead Inspector (575) 626-4278; James Hamilton Construction Co.-Jim Bauer - Project Superintendant (575) 538-1779 Joseph Chermiah - Traffic Control Supt. (575) 388-7543

last updated 2009-11-06 07:49:10.67 MST

Construction Closure Construction Closure - NM 524

New Mexico 5_24 at Texas Street to 6th Street (Standpipe Rd).

Title: New Mexico 5_24 at Texas Street to 6th Street (Standpipe Rd).
Description: Nm 524 (Lea Street) will be closed to through traffic from Texas Street to 6th Street (Standpipe Rd) while street improvements are ongoing Mondays through Thursdays until the end of the year - Dec 2009. Traffic will be detoured onto Texas and 6th Streets. Watch for Detour Signs. Width restriction is in effect for detour. Please use an alternate route. Note: Roadway will remain closed to through traffic during non-construction hours. Contractor: Rachel Bustos 575-526-4421 (lc)

last updated 2009-11-19 10:16:22.487 MST

Roadwork Roadwork - US 62

U_S 62 Northbound and Southbound from mile marker 16 to mile marker 26 at mile marker 16.

Title: U_S 62 Northbound and Southbound from mile marker 16 to mile marker 26 at mile marker 16.
Description: Roadway reconstruction; Contractor with construction personnel and equipment being used for daily operations from 6:00am - 6:00pm Monday - Friday. One - lane traffic control operations with pilot vehicle periodically, expect some delays. Please pay attention to Construction Signs from MP 16.250 to MP 25.980; NMDOT Project Manager, Cecil Pendergrass, 575-626.9873; James Hamilton Construction Contractor Contact, Joseph Jeremiah, JHC Safety Officer 505.388.7543; Estimated completion for this project is November 2009.

last updated 2009-11-13 14:40:44.17 MST

Roadwork Roadwork - US 62

U_S 62 Northbound and Southbound from mile marker 0 to mile marker 16 at Eddy County.

Title: U_S 62 Northbound and Southbound from mile marker 0 to mile marker 16 at Eddy County.
Description: Roadway reconstruction; Traffic has been switched to four lanes. Speed limits are still posted at 55 mph. Please pay attention to construction signs throughout project; Width restrictions limits to 10' from MP 0.00 to MP 16.00. NMDOT Project Manager, Cecil Pendergrass, 575-626.9873; James Hamilton Construction Contractor Contact, Joseph Jeremiah, JHC Safety Officer 505.388.7543; Estimated completion for this project is November 2009.

last updated 2009-11-06 07:49:10.67 MST

Lane Closure Lane Closure - US 70

U_S 70 Eastbound from mile marker 262 to mile marker 263 at Ruidoso Downs.

Title: U_S 70 Eastbound from mile marker 262 to mile marker 263 at Ruidoso Downs.
Description: On US 70 from MM 262 to MM 263 the eastbound right lane and shoulder will be closed while the local government does some improvements. This is in Ruidoso Downs. In case of emergency call Larry Clayton at 505-259-7400.

last updated 2009-11-13 14:45:47.250 MST

Alert Alert - US 82

U_S 82 Eastbound and Westbound 16 miles East of Alamogordo to Cloudcroft.

Title: U_S 82 Eastbound and Westbound 16 miles East of Alamogordo to Cloudcroft.
Description: US 82 between Cloudcroft and Alamogordo descends 5000 feet in 16 miles. Steep grades, numerous tight turns and one tunnel. Trucks without retarder brakes and/or longer than 65 feet in length PROHIBITED on this section of US 82. Consider using an alternative route - US 62/180 or US 70. This is a permanent restriction and will not be updated. (dh) For more info go to: http://nmshtd.state.nm.us/upload/images/District%202/US82_Advisory.pdf

last updated 2009-11-19 10:16:22.487 MST

Alert Alert - US 285

U_S 2_85 Northbound and Southbound 40 miles South of NM State Line to Pecos TX Width Restriction

Title: U_S 2_85 Northbound and Southbound 40 miles South of NM State Line to Pecos TX Width Restriction
Description: Width restriction in effect for US 285 from NM State Line to Pecos Texas. Contact TXDOT Permit Office; or Gary W. Larum At (432) 498-4746. This is a permanent restriction and will not be updated. (dh)

last updated 2009-11-19 10:16:22.487 MST

Roadwork Roadwork - US 380

U_S 3_80 Eastbound and Westbound from mile marker 157 to mile marker 162 at mile marker 157.

Title: U_S 3_80 Eastbound and Westbound from mile marker 157 to mile marker 162 at mile marker 157.
Description: This is a structure extension project on U.S. 380 east of Roswell from mile marker 157 to mile marker 162, Work will begin on Monday, November 9, 2009. This project includes culvert extensions, new guardrails, new embankment curbs, and drainage ditch improvements. There will be temporary one lane closures for the duration of this project. Work hours are from 7:00 a.m. and 5:00 p.m., Monday thru Friday. Motorists may experience delays of up to five minutes through the work zone. The project is scheduled to be completed in mid-March 2010, weather permitting. For more information concerning this work please contact Dave Dawson, NMDOT Project Manager at 575-637-7811 or Jeff Anderson , NMDOT Project Supv. (575) 637-7814.

last updated 2009-11-20 11:09:42.503 MST

Roadwork Roadwork - I 25

Interstate 25 from mile marker 234 to mile marker 240 at Tramway to Bernalillo.

Title: Interstate 25 from mile marker 234 to mile marker 240 at Tramway to Bernalillo.
Description: GRIP I25 / Tramway to Bernalillo Interstate Reconstruction (Loomis/FNF Const.) Ongoing and until further notice - I-25 both directions between Tramway and Bernalillo has the speed limit reduced to 55 mph. Double fine zone is in effect. Where barrier wall has been placed lanes are reduced to 11 feet wide. ENHANCED LAW ENFORCEMENT WILL BE IN PLACE THROUGHOUT THE PROJECT.

last updated 2009-11-13 14:26:06.327 MST

Roadwork Roadwork - I 25

Interstate 25 from mile marker 220 to mile marker 222 at Gibson to Rio Bravo Interstate.

Title: Interstate 25 from mile marker 220 to mile marker 222 at Gibson to Rio Bravo Interstate.
Description: D3017C/I25/Gibson to Rio Bravo Interstate Improvement Project (T. Chavez/A.S. Horner.) Ongoing and until further notice. This project has been suspended until spring of 2010 at which time the final paving will be placed down during warmer weather. All lanes and ramps are fully operational.

last updated 2009-11-18 08:43:17.343 MST

Roadwork Roadwork - I 40

Interstate 40 Eastbound and Westbound from mile marker 148 to mile marker 149 at West Central, at Paseo Del Volcan.

Title: Interstate 40 Eastbound and Westbound from mile marker 148 to mile marker 149 at West Central, at Paseo Del Volcan.
Description: Ongoing through November 2009. I 40 both directions eastbound and westbound will share the westbound lanes. GRIP/ARRA/West Central Interstate/Interchange Reconstruction/This is a 330 calendar day project. (Loomis/Mtn States)

last updated 2009-11-18 15:52:35.813 MST

Lane Closure Lane Closure - I 40

Interstate 40 Westbound from mile marker 178 to mile marker 178 at the Zuzax exit.

Title: Interstate 40 Westbound from mile marker 178 to mile marker 178 at the Zuzax exit.
Description: Monday 11/23 through Wednesday 11/25 from 9am to 3pm each weekday (Qualcom).- I40 westbound at Zuzax (exit178 / Tijeras Canyon) will have the left lane closed for bridge maintenance.

last updated 2009-11-20 13:34:03.153 MST

Roadwork Roadwork - I 40

Interstate 40 Westbound from mile marker 155 to mile marker 155 at The I40 westbound off ramp to the northbound Coors Frontage road.

Title: Interstate 40 Westbound from mile marker 155 to mile marker 155 at The I40 westbound off ramp to the northbound Coors Frontage road.
Description: Tuesday 11/10 through Tuesday 11/24 from 7am to 3:30pm each weekday (ASH).- The I40 westbound off ramp to the northbound Coors Frontage road will have construction activity on the shoulder. Be alert for construction vehicles accessing and leaving the work zone.

last updated 2009-11-06 16:16:44.503 MST

Lane Closure Lane Closure - I 40

Interstate 40 Westbound at between Eubank and Washington.

Title: Interstate 40 Westbound at between Eubank and Washington.
Description: • Ongoing through Friday 12/18 from 10am to 2:30pm each weekday (ASH)- I40 westbound between Eubank and Washington will have various left lane closures for diversion channel repair.

last updated 2009-11-13 16:27:00.293 MST

Lane Closure Lane Closure - I 40

Interstate 40 Eastbound and Westbound at mile marker 178.

Title: Interstate 40 Eastbound and Westbound at mile marker 178.
Description: • Monday 11/23 through Friday 11/27 from 7am to 5pm each weekday (Qualcom).- The Zuzax overpass (exit178 / Tijeras Canyon) at I40 will be reduced to one lane only for bridge deck maintenance. Flaggers will be onsite to move traffic through the work zone.

last updated 2009-11-20 13:30:27.60 MST

Lane Closure Lane Closure - NM 6

New Mexico 6 Eastbound and Westbound from mile marker 22 to mile marker 29 at (Rio Puerco to the County Landfill).

Title: New Mexico 6 Eastbound and Westbound from mile marker 22 to mile marker 29 at (Rio Puerco to the County Landfill).
Description: Monday 11/23 through Friday 12/4 from 8am to 5pm each weekday (Apache Const.).- NM6 between mile markers 22 and 29 (Rio Puerco to the County Landfill) will be reduced to one lane in various locations for guardrail installation. Flagmen will be onsite to move traffic through the work zone.

last updated 2009-11-20 13:42:40.273 MST

Roadwork Roadwork - NM 6

New Mexico 6 Eastbound at the intersection of NM263 (mm 36 / Lakeview Dr.).

Title: New Mexico 6 Eastbound at the intersection of NM263 (mm 36 / Lakeview Dr.).
Description: Monday 11/23 through Wednesday 11/25 from 9am to 3pm each weekday (Qwest).- NM6 eastbound from at the intersection of NM263 (mm 36 / Lakeview Dr.) will have the right lane closed for utility work.

last updated 2009-11-20 13:39:20.853 MST

Special Event Special Event - NM 448

New Mexico 4_48 Northbound and Southbound at from Old Church rd. to Coronado rd..

Title: New Mexico 4_48 Northbound and Southbound at from Old Church rd. to Coronado rd..
Description: Sunday 11/22 from 12:45pm to 2pm - NM448 (Corrales Rd.) from Old Church Rd. to Coronado Rd. will be closed for Christmas Parade.

last updated 2009-11-20 13:37:27.230 MST

Roadwork Roadwork - I 40

Interstate 40 Eastbound and Westbound from mile marker 328 to mile marker 335 at Quay County.

Title: Interstate 40 Eastbound and Westbound from mile marker 328 to mile marker 335 at Quay County.
Description: 13' ramp width at exit 333 -- speed reduced to 25 mph at the ramps

last updated 2009-11-17 13:02:27.47 MST

Roadwork Roadwork - I 40

Interstate 40 Eastbound and Westbound from mile marker 316 to mile marker 324 at Quay County.

Title: Interstate 40 Eastbound and Westbound from mile marker 316 to mile marker 324 at Quay County.
Description: Lane width reduced to 12 speed limit 55 mph through the project.

last updated 2009-11-17 13:02:27.47 MST

Roadwork Roadwork - I 40

Interstate 40 Eastbound and Westbound from mile marker 203 to mile marker 203.

Title: Interstate 40 Eastbound and Westbound from mile marker 203 to mile marker 203.
Description: New Mexico - Texas Stateline

last updated 2009-11-20 13:29:24.873 MST

Roadwork Roadwork - NM 39

New Mexico 39 from mile marker 6 to mile marker 14, 5 miles North of UTE Dam.

Title: New Mexico 39 from mile marker 6 to mile marker 14, 5 miles North of UTE Dam.
Description: Speed reduced 45 mph

last updated 2009-11-17 13:02:41.500 MST

Roadwork Roadwork - NM 104

New Mexico 1_04 Eastbound and Westbound from mile marker 52 to mile marker 53, 1 mile South of Garita.

Title: New Mexico 1_04 Eastbound and Westbound from mile marker 52 to mile marker 53, 1 mile South of Garita.
Description: Detour in place speed reduced to 35 mph

last updated 2009-11-17 13:01:43.110 MST

Roadwork Roadwork - NM 402

New Mexico 4_02 Northbound and Southbound 60 miles South of Clayton at mile marker 15.

Title: New Mexico 4_02 Northbound and Southbound 60 miles South of Clayton at mile marker 15.
Description: speed reduced to 45 mph

last updated 2009-11-17 13:02:41.500 MST

Roadwork Roadwork - US 64

U_S 64 Eastbound and Westbound from mile marker 390 to mile marker 400 at Union Co.

Title: U_S 64 Eastbound and Westbound from mile marker 390 to mile marker 400 at Union Co.
Description: Speed reduced to 55 mph

last updated 2009-11-16 13:31:47.17 MST

Roadwork Roadwork - US 84

U_S 84 1 mile South of Arroyo Seco at mile marker 184.

Title: U_S 84 1 mile South of Arroyo Seco at mile marker 184.
Description: Traffic on Camino Arroyo Seco is now on the new alignment, which is located 200 feet north of the old alignment; various traffic control operations in progress between Arroyo Seco and into the City of Espanola for the next several months; be aware of shifted lanes and single lane traffic through the area; please slow down and obey construction speed limits.

last updated 2009-11-20 08:42:50.20 MST

Lane Closure Lane Closure - US 84

U_S 84 from mile marker 182 to mile marker 184, 2 miles South of Arroyo Seco.

Title: U_S 84 from mile marker 182 to mile marker 184, 2 miles South of Arroyo Seco.
Description: Single lane closures between 9 am and 3 pm for blade patching operations.

last updated 2009-11-13 14:49:00.670 MST

Lane Closure Lane Closure - I 40

Interstate 40 from mile marker 126 to mile marker 132 at Junction I 40 to Tojajiillee.

Title: Interstate 40 from mile marker 126 to mile marker 132 at Junction I 40 to Tojajiillee.
Description: Speed is also reduced to 55 mph through the work zone. 16 foot width restriction through work zone. All work will be performed from 7am to 7 pm, Monday through Saturday. Please drive with caution, reduce your speed and obey all posted traffic signs.

last updated 2009-11-20 07:56:23.883 MST

Roadwork Roadwork - I 40

Interstate 40 Eastbound and Westbound from Prewitt to Thoreau.

Title: Interstate 40 Eastbound and Westbound from Prewitt to Thoreau.
Description: Roadwork on I-40 mile marker 54-58 (Prewitt to Thoreau). Traffic has been reduced to one lane in both directions near Thoreau. Westbound traffic has been moved onto the eastbound passing lane. Speed reduced to 55 mph and 12 foot width restriction through the work zone. All work will be performed from 7am to 5:30pm Monday through Friday. Please drive wtih caution and obey all posted traffic signs. Buckle Up. Thank you.

last updated 2009-11-20 07:56:23.883 MST

Alert Alert - NM 371

New Mexico 3_71 Northbound and Southbound at Smith Lake.

Title: New Mexico 3_71 Northbound and Southbound at Smith Lake.
Description: NM 371, mile marker 15 (Smith Lake). Speed reduced to 35 mph. Contractor currently cleaning up work zone. Please drive with caution, reduce your speed and obey all posted traffic signs.

last updated 2009-11-20 07:56:23.883 MST

Alert Alert - US 491

U_S 4_91 Northbound and Southbound at from Newcomb to Little Water.

Title: U_S 4_91 Northbound and Southbound at from Newcomb to Little Water.
Description: US 491, mile marker 59-67 (From Newcomb to Little Water). Currently no impacts to traffic. All work being performed on Northbound right-of-way. Watch for equipment. All work will be performed from 7am to 6pm Monday through Friday. Please drive with caution and obey all posted traffic signs.

last updated 2009-11-20 07:56:23.883 MST

Roadwork Roadwork - US 491

U_S 4_91 Northbound and Southbound from mile marker 15 to mile marker 29, 1 mile South of Buffalo Springs.

Title: U_S 4_91 Northbound and Southbound from mile marker 15 to mile marker 29, 1 mile South of Buffalo Springs.
Description: Roadwork on US 491, mile marker 15-29 (from Jct. US 491/NM 264 at Yah-ta-Hay to South of Buffalo Springs) Speed reduced to 55 mph through project limits and 45 mph through the work zone. Roadway reduced to one lane in both directions. Flaggers and pilot car will guide traffic through the work zone. All work will be performed from 7 am to 5 pm Monday through Friday. Please drive with caution, reduce your speed and obey all posted traffic signs.

last updated 2009-11-20 07:56:23.883 MST