|
|

Lane Closure
-
I 10
Interstate 10 Eastbound from mile marker 144 to mile marker 145, 1 mile East of Las Cruces.
Title:
Interstate 10 Eastbound from mile marker 144 to mile marker 145, 1 mile East of Las Cruces.
Description:
The passing lane will be closed all week along with the South bound driving lane on I-25 from milepost 0 to milepost 1.
last updated
2009-11-03 08:25:02.140 MST
|

Alert
-
I 25
Interstate 25 Southbound from mile marker 1 to mile marker 1 at University.
Title:
Interstate 25 Southbound from mile marker 1 to mile marker 1 at University.
Description:
University exit will experience back up with traffic for those entering in off I25, please use caution.
last updated
2009-10-26 11:28:57.170 MDT
|

Roadwork
-
I 25
Interstate 25 Eastbound at Lohman and Telshor.
Title:
Interstate 25 Eastbound at Lohman and Telshor.
Description:
Lohman and Telshor will experience lane closures and reduction in speed as the contractor works on wideing the road. Please use caution, questions can be adddressed to the City of Las Cruces.
last updated
2009-10-02 09:51:38.310 MDT
|

Roadwork
-
NM 273
New Mexico 2_73 Northbound and Southbound from mile marker 5 to mile marker 9 at Sunland Park.
Title:
New Mexico 2_73 Northbound and Southbound from mile marker 5 to mile marker 9 at Sunland Park.
Description:
Motorists traveling in the Sunland Park area on NM273 will experience lane drops with reduction in speed as work continues along the project. Please use caution and contact the NMDOT for questions regarding this project.
last updated
2009-10-16 13:47:12.780 MDT
|

Roadwork
-
NM 83
New Mexico 83 Eastbound and Westbound from mile marker 2 to mile marker 12 at mile marker 2.
Title:
New Mexico 83 Eastbound and Westbound from mile marker 2 to mile marker 12 at mile marker 2.
Description:
Traffic is now 4 lane from the start of the Project to Country Club Road. Two way Traffic form Country club.Detour in place at Mile Post 5. Posted Speed 25MPH. Expected completion in Spring 2010. NMDOT Project Manager Richard Gonzales 575-626-9875, or NMDOT Assistant Project Manager Jeff Hatch 575-626-8217. Contractor Emergency Contact is Shane Timms 575-602-3802.
last updated
2009-10-30 10:20:04.983 MDT
|

Roadwork
-
NM 128
New Mexico 1_28 Eastbound and Westbound from 24 to 38.
Title:
New Mexico 1_28 Eastbound and Westbound from 24 to 38.
Description:
Construction taking place along side of existing Roadway. Occasional interruption to travelling public will have traffic control with barrels and pilot car. Fines double within the construction zone. Travelling public urged to pay close attention to on-going construction and traffic speed limits. Estimated Completion Date on this project is June of 2010. Emergency Contacts:NMDOT Cecil Pendergrass, Project Manager (575) 626-9874; Nathan Palomarez, NMDOT Lead Inspector (575) 626-4278; James Hamilton Construction Co.-Jim Bauer - Project Superintendant (575) 538-1779 Joseph Chermiah - Traffic Control Supt. (575) 388-7543
last updated
2009-10-22 13:19:27.857 MDT
|

Roadwork
-
NM 128
New Mexico 1_28 Eastbound and Westbound from 38 to 49 at Lea County.
Title:
New Mexico 1_28 Eastbound and Westbound from 38 to 49 at Lea County.
Description:
No interruption to traffic flow at this time. Heavy equipment is present. The travelling public is urged to pay close attention to traffic control and signs. Emergency Numbers:
NDMOT Project Manager Cecil Pendergrass, (575) 626-9874; Contractor James Hamilton Construction -Jim Bauer, Project Supt (575)538-1779; Joseph Chermiah, Proj. Safety Officer (575) 388-7543
last updated
2009-10-26 10:02:10.733 MDT
|

Roadwork
-
NM 249
New Mexico 2_49 Eastbound and Westbound from mile marker 1 to mile marker 2 at mile marker 1.
Title:
New Mexico 2_49 Eastbound and Westbound from mile marker 1 to mile marker 2 at mile marker 1.
Description:
Roadway Rehabilitation and sidewalk improvement work on NM 249, from mile post 0.00 to mile post 1.05, through the Town of Hagerman is underway. Work is expected to last four to five months.
During this project motorists can expect a one-lane closure and short delays between the hours of 7:00 a.m. and 5:00 p.m., Monday through Friday. Drivers are asked to watch for construction personnel working in the area, observe temporary construction signing, and reduce speed to the posted speed limits.
Questions may be directed to David Dawson, NMDOT Project Manager, (575)637-7811, Jeff Anderson, NMDOT Assistant Project Manager (575)637-7814
last updated
2009-10-29 15:48:57.57 MDT
|

Construction Closure
-
NM 524
New Mexico 5_24 Northbound and Southbound at Texas Street to 6th Street (Standpipe Rd).
Title:
New Mexico 5_24 Northbound and Southbound at Texas Street to 6th Street (Standpipe Rd).
Description:
NM 524 (Lea Street) will be closed to through traffic from Texas Street to 6th Street (Standpipe Rd) while street improvements are ongoing Mondays through Thursdays until the end of the year- Dec 2009 . Traffic will be detoured onto Texas and 6th Streets. Watch for Detour Signs. Width restriction is in effect for detour. Please use an alternate route. NOTE: Roadway will remain closed to through traffic during non-construction hours. Contractor: Burn Construction Company Inc. Contact: Rachel Bustos 575-526-4421. (lc)
last updated
2009-10-29 08:32:41.563 MDT
|

Roadwork
-
US 62
U_S 62 Northbound and Southbound from mile marker 0 to mile marker 16 at Eddy County.
Title:
U_S 62 Northbound and Southbound from mile marker 0 to mile marker 16 at Eddy County.
Description:
Roadway reconstruction; Traffic has been switched to four lanes. Speed limits are still posted at 55 mph. Please pay attention to construction signs throughout project; Width restrictions limits to 10' from MP 0.00 to MP 16.00.
NMDOT Project Manager, Cecil Pendergrass, 575-626.9873; James Hamilton Construction Contractor Contact, Joseph Jeremiah, JHC Safety Officer 505.388.7543; Estimated completion for this project is November 2009.
last updated
2009-10-26 10:17:04.780 MDT
|

Roadwork
-
US 62
U_S 62 Northbound and Southbound from 16 to 26 at Carlsbad Cavern.
Title:
U_S 62 Northbound and Southbound from 16 to 26 at Carlsbad Cavern.
Description:
Roadway reconstruction; Contractor with construction personnel and equipment being used for daily operations from 6:00am - 6:00pm Monday - Friday. One -lane traffic control operations with pilot vehicle periodically, expect some delays. Please pay attention to Construction Signs from MP 16.250 to MP 25.980; NMDOT Project Manager, Cecil Pendergrass, 575-626.9873; James Hamilton Construction Contractor Contact, Joseph Jeremiah, JHC Safety Officer 505.388.7543; Estimated completion for this project is November 2009.
last updated
2009-10-26 10:14:23.920 MDT
|

Lane Closure
-
US 82
U_S 82 Southbound from mile marker 171 to mile marker 172 at mile marker 171.
Title:
U_S 82 Southbound from mile marker 171 to mile marker 172 at mile marker 171.
Description:
On NM 18 / US 82 , Madison to Polk, NBL's subject to One Lane Closure from 7:00 am to 5:00 PM. Watch for Workers and equipment in the Work Zone. Work hours are from 7 AM to 5:30 PM Monday through Friday. A community parade will commence at 2:00 PM until 3:00 PM. Main Street will be closed. Emergency Contact’s are NMDOT Project Manager Richard Gonzales-575-626-9875, NMDOT Tech Supervisor Jeff Hatch-575-626-8217, and Contractor Constructors Inc. Project Supervisor Scott Jenks-575-441-8161. Est Completion date is Dec 14th 2009.
last updated
2009-10-30 10:21:17.333 MDT
|

Alert
-
US 82
U_S 82 Eastbound and Westbound 16 miles East of Alamogordo to Cloudcroft.
Title:
U_S 82 Eastbound and Westbound 16 miles East of Alamogordo to Cloudcroft.
Description:
US 82 between Cloudcroft and Alamogordo descends 5000 feet in 16 miles. Steep grades, numerous tight turns and one tunnel. Trucks without retarder brakes and/or longer than 65 feet in length PROHIBITED on this section of US 82. Consider using an alternative route - US 62/180 or US 70. This is a permanent restriction and will not be updated. (dh)
For more info go to: http://nmshtd.state.nm.us/upload/images/District%202/US82_Advisory.pdf
last updated
2009-10-29 08:33:02.220 MDT
|

Alert
-
US 285
U_S 2_85 Northbound and Southbound 40 miles South of NM State Line to Pecos TX Width Restriction
.
Title:
U_S 2_85 Northbound and Southbound 40 miles South of NM State Line to Pecos TX Width Restriction
.
Description:
Width restriction in effect for US 285 from NM State Line to Pecos Texas. Contact TXDOT Permit Office; or Gary W. Larum At (432) 498-4746.
last updated
2009-11-03 11:37:05.107 MST
|

Roadwork
-
I 25
Interstate 25 Northbound and Southbound from mile marker 220 to mile marker 222 at Rio Bravo to Gibson.
Title:
Interstate 25 Northbound and Southbound from mile marker 220 to mile marker 222 at Rio Bravo to Gibson.
Description:
D3017C / I25 /Gibson to Rio Bravo Interstate Improvement Project (T.Chavez/A.S.Horner.)
Ongoing and until further notice- This project has been suspended until spring of 2010 at which time the final paving will be placed down during warmer weather. All lanes and ramps are fully operational.
last updated
2009-10-26 09:54:38.313 MDT
|

Roadwork
-
I 25
Interstate 25 Northbound and Southbound from mile marker 193 to mile marker 197.
Title:
Interstate 25 Northbound and Southbound from mile marker 193 to mile marker 197.
Description:
Ongoing through Friday 11/6 (including Saturday’s) from 9am to 4:30pm– I25 both directions from mile marker 193 to 197 will have various lane closures for paving project.
last updated
2009-10-29 16:34:05.80 MDT
|

Roadwork
-
I 25
Interstate 25 from mile marker 234 to mile marker 240 at I25 Tramway to Bernalillo.
Title:
Interstate 25 from mile marker 234 to mile marker 240 at I25 Tramway to Bernalillo.
Description:
GRIP I25 / Tramway to Bernalillo Interstate Reconstruction (Loomis/FNF Const.)
Thursday 10/29 and Sunday 11/1 from 9pm to 5am each evening- I-25 northbound between Tramway and Bernalillo will be reduced to one lane. Speed limit has been reduced to 55 mph northbound. Double fine zone is in effect. Where barrier wall has been placed lanes are reduced to 11 feet wide.
Monday 11/2 through Thursday 11/5 from 9pm to 5am each evening- I-25 southbound between Bernalillo and Tramway will be reduced to one lane. Speed limit has been reduced to 55 mph northbound. Double fine zone is in effect. Where barrier wall has been placed lanes are reduced to 11 feet wide.
last updated
2009-10-29 16:29:56.423 MDT
|

Roadwork
-
I 40
Interstate 40 Eastbound and Westbound from mile marker 160 to mile marker 162, 2 miles East of Big I at San Mateo.
Title:
Interstate 40 Eastbound and Westbound from mile marker 160 to mile marker 162, 2 miles East of Big I at San Mateo.
Description:
GRIP I40 / San Mateo to Carlisle Interstate Reconstruction (Barela / ASH)
Friday 10/30 from 9pm to 5am each evening. - The I40 westbound off ramp at San Mateo will be closed.
Ongoing through Friday 10/30 from 9pm to 5am each evening. - I40 Both directions from San Pedro to Carlisle will have the 2 left lanes closed (wb reduced to one lane and eb reduced to 2 lanes).
Ongoing and until further notice - The San Mateo Northbound onramp to I40 Westbound will be closed for the duration of the project.
last updated
2009-10-29 16:23:52.517 MDT
|

Lane Closure
-
I 40
Interstate 40 Westbound from mile marker 161 to mile marker 165 at from Eubank to Washington.
Title:
Interstate 40 Westbound from mile marker 161 to mile marker 165 at from Eubank to Washington.
Description:
NEW! Friday 10/23 through Friday 12/18 from 10am to 2:30pm each weekday (ASH)- I40 westbound between Eubank and Washington will have various left lane closures for diversion channel repair.
last updated
2009-10-21 16:03:27.820 MDT
|

Roadwork
-
I 40
Interstate 40 Eastbound and Westbound from 148 to 149 at the West Central/Paseo Del Volcan Interchange.
Title:
Interstate 40 Eastbound and Westbound from 148 to 149 at the West Central/Paseo Del Volcan Interchange.
Description:
GRIP/ARRA/ I40 / West Central / Paseo Del Volcan Interstate/Interchange Reconstruction / This is a 330 calendar day project. (Loomis/ Mtn States)
Ongoing through November - I40 both directions from mile marker 148 to 149 (Exit 149 Paseo Del Volcan) will share the westbound lanes (2 Lanes each direction).
last updated
2009-10-29 16:25:14.830 MDT
|

Lane Closure
-
I 40
Interstate 40 Eastbound and Westbound from mile marker 174 to mile marker 178 at Zuzax to Tijeras.
Title:
Interstate 40 Eastbound and Westbound from mile marker 174 to mile marker 178 at Zuzax to Tijeras.
Description:
GRIP I40 / Zuzax to Tijeras Interstate Reconstruction (Jeter/ Mtn States)
Ongoing through Wednesday 11/4 from 5am to 2pm each weekday - I40 eastbound from Tijeras to Zuzax will be reduced to one lane. Expect delays!
last updated
2009-10-29 16:25:57.360 MDT
|

Lane Closure
-
NM 423
New Mexico 4_23 Eastbound from mile marker 7 to mile marker 7 at Paseo Del Norte at Barstow.
Title:
New Mexico 4_23 Eastbound from mile marker 7 to mile marker 7 at Paseo Del Norte at Barstow.
Description:
Ongoing through Wednesday 11/4 from 8:30am to 3pm each weekday (DBSI)- Paseo Del Norte eastbound at Barstow will have the right lane closed for sidewalk construction.
last updated
2009-10-26 10:35:10.860 MDT
|

Lane Closure
-
NM 423
New Mexico 4_23 Eastbound and Westbound from mile marker 5 to mile marker 6 at San Pedro.
Title:
New Mexico 4_23 Eastbound and Westbound from mile marker 5 to mile marker 6 at San Pedro.
Description:
Monday 11/2 through Friday 11/13 from 9am to 3pm each weekday (MDWC)- NM423 (Paseo Del Norte) both directions at San Pedro will have various single lane closures for signal installation.
last updated
2009-10-29 16:33:40.33 MDT
|

Lane Closure
-
I 25
Interstate 25 Northbound from mile marker 276 to mile marker 276 at New Mexico 5 99.
Title:
Interstate 25 Northbound from mile marker 276 to mile marker 276 at New Mexico 5 99.
Description:
Single lane closures between 9 am and 5 pm for approximately one week for snow fence installation.
last updated
2009-10-26 10:56:12.983 MDT
|

Difficult Driving Conditions
-
NM 475
New Mexico 4_75 from mile marker 0 to mile marker 15.
Title:
New Mexico 4_75 from mile marker 0 to mile marker 15.
Description:
This road may remain snow packed and icy in shady spots during the winter season; crews plow and sand the roadway between 4 am and 7 pm during a snow storm; please drive with caution at all times.
last updated
2009-10-30 13:35:56.577 MDT
|

Roadwork
-
US 84
U_S 84 1 mile South of Arroyo Seco at mile marker 184.
Title:
U_S 84 1 mile South of Arroyo Seco at mile marker 184.
Description:
Traffic on Camino Arroyo Seco is now on the new alignment, which is located 200 feet north of the old alignment; various traffic control operations in progress between Arroyo Seco and into the City of Espanola for the next several months; be aware of shifted lanes and single lane traffic through the area; please slow down and obey construction speed limits.
last updated
2009-10-30 13:36:36.543 MDT
|

Alert
-
US 550
U_S 5_50 from Twin Pines area to Blanco Trading Post.
Title:
U_S 5_50 from Twin Pines area to Blanco Trading Post.
Description:
shoulder work in progress; be aware of equipment and slow moving vehicles in the area.
last updated
2009-11-03 07:53:13.887 MST
|

Alert
-
I 40
Interstate 40 Eastbound 5 miles East of Dancing Eagle Casino at Scenic View Rest Stop.
Title:
Interstate 40 Eastbound 5 miles East of Dancing Eagle Casino at Scenic View Rest Stop.
Description:
Eastbound I-40 Scenic View Rest Stop at mile marker 113 (East of Dancing Eagle Casino) will be closed on 11/3 from 9am to 2:30pm due to road maintenance work. Please drive with caution and obey all posted traffic signs.
last updated
2009-11-03 08:16:59.833 MST
|

Lane Closure
-
I 40
Interstate 40 Eastbound and Westbound from mile marker 126 to mile marker 132 at Junction I 40, New Mexico 6 to Tohajiillee.
Title:
Interstate 40 Eastbound and Westbound from mile marker 126 to mile marker 132 at Junction I 40, New Mexico 6 to Tohajiillee.
Description:
I-40, mile marker 126-132 (From Jct. I-40/NM 6 to Tohajiillee) reduced to one lane in both directions. Eastbound traffic has been moved onto the eastbound passing lane until Friday, 10/16, for guardrail placement. Speed is also reduced to 55 mph through the work zone. 16 foot width restriction through work zone. All work will be performed from 7am to 7pm Monday through Saturday. Please drive with caution, reduce your speed and obey all posted traffic signs.
last updated
2009-11-03 07:53:13.887 MST
|

Lane Closure
-
I 40
Interstate 40 Eastbound 3 miles East of East Gallup.
Title:
Interstate 40 Eastbound 3 miles East of East Gallup.
Description:
Eastbound I-40 reduced to one lane from mile marker 29-33 (East of Gallup) due to road maintenance work. All work will be performed from 6:30am to 6pm daily beginning 11/3 through 11/6. Please drive with caution, reduce your speed and obey all posted traffic signs.
last updated
2009-11-03 07:52:44.37 MST
|

Roadwork
-
I 40
Interstate 40 Eastbound and Westbound from mile marker 54 to mile marker 62 at Thoreau.
Title:
Interstate 40 Eastbound and Westbound from mile marker 54 to mile marker 62 at Thoreau.
Description:
Roadwork on I-40 mile marker 54-62 (Prewitt to Thoreau). Traffic has been reduced to one lane in both directions near Thoreau. Westbound traffic has been moved onto the eastbound passing lane. Speed reduced to 55 mph and 12 foot width restriction through the work zone. All work will be performed from 7am to 5:30pm Monday through Friday. Please drive wtih caution and obey all posted traffic signs. Buckle Up. Thank you.
last updated
2009-11-03 07:53:13.887 MST
|

Roadwork
-
I 40
Interstate 40 Eastbound and Westbound from 102 to 102 at Sky City Casino.
Title:
Interstate 40 Eastbound and Westbound from 102 to 102 at Sky City Casino.
Description:
I-40, Exit 102 (at Sky City Casino) reduced to one lane in each direction at the interchange. Speed is reduced to 55 mph through the work zone. EASTBOUND LANE RESTRICTED TO 10 FEET. ALL OVERSIZE LOADS MUST USE EXIT 102 INTERCHANGE. SP 130 (To ACL Hospital) is closed at the 102 Interchange. Detour in place at NM 124 and SP 130 Spur at Exit 100 Interchange. Truck traffic present on NM 124 and NM 124 Spur. All work will be performed from 7am to 5pm Monday through Friday. Please drive with caution, reduce your speed and obey all posted traffic signs.
last updated
2009-11-03 07:53:13.887 MST
|

Difficult Driving Conditions
-
NM 4
New Mexico 4 Eastbound and Westbound from mile marker 24 to mile marker 47.
Title:
New Mexico 4 Eastbound and Westbound from mile marker 24 to mile marker 47.
Description:
Difficult Driving Conditions on NM 4, mile marker 24 - 46.5 (From La Cueva to Los Alamos County Line). Roadway is icy in shaded areas. Visibility is good. Please drive with caution and reduce your speed. This event will be updated as road conditions change.
last updated
2009-11-03 07:53:13.887 MST
|

Difficult Driving Conditions
-
NM 126
New Mexico 1_26 Eastbound and Westbound from mile marker 25 to mile marker 38.
Title:
New Mexico 1_26 Eastbound and Westbound from mile marker 25 to mile marker 38.
Description:
Difficult Driving Conditions on NM 126, mile marker 25.5 - 38.5 (From Seven Springs Fish Hatchery to La Cueva). Roadway is icy in shaded areas. Visibility is good. Please drive with caution and reduce your speed. This event will be updated as road conditons change.
last updated
2009-11-03 07:53:13.887 MST
|

Alert
-
NM 371
New Mexico 3_71 Northbound and Southbound from mile marker 15 to mile marker 15 at Smith Lake.
Title:
New Mexico 3_71 Northbound and Southbound from mile marker 15 to mile marker 15 at Smith Lake.
Description:
NM 371, mile marker 15 (Smith Lake). Speed reduced to 35 mph. Contractor currently cleaning up work zone. Please drive with caution, reduce your speed and obey all posted traffic signs.
last updated
2009-11-03 07:53:13.887 MST
|

Lane Closure
-
US 550
U_S 5_50 Northbound and Southbound from North Bernalillo to San Ysidro, left lane closed.
Title:
U_S 5_50 Northbound and Southbound from North Bernalillo to San Ysidro, left lane closed.
Description:
North and Southbound US 550 will be reduced to one lane in each direction from ile marker 9-23 (From North of Bernalillo to San Ysdiro). Both passing lanes will be closed due to road maintenance work. All work will be performed from 9am to 5pm. Lanes will be closed from mile marker 9-19 on 11/3 and mile marker 19-23 on 11/4. Please drive with caution, reduce your speed and obey all posted traffic signs. No delays are expected.
last updated
2009-11-03 09:22:27.747 MST
|

Roadwork
-
US 550
U_S 5_50 Northbound and Southbound from mile marker 64 to mile marker 115.
Title:
U_S 5_50 Northbound and Southbound from mile marker 64 to mile marker 115.
Description:
Roadwork on US 550, mile marker 64-115 (From Cuba to North of Lybrook). Intermittent lane closures. Speed reduced to 50 mph from 2-4pm daily, otherwise speed limit is 70mph. 12 foot width restriction on northbound lanes and 15 foot width restriction on southbound lanes. Please drive with caution, reduce your speed and obey all posted traffic signs.
last updated
2009-10-21 16:21:11.10 MDT
|

Roadwork
-
US 550
U_S 5_50 Northbound and Southbound from mile marker 64 to mile marker 115 at North of Lybrook.
Title:
U_S 5_50 Northbound and Southbound from mile marker 64 to mile marker 115 at North of Lybrook.
Description:
US 550, mile marker 64-115 (From Cuba to North of Lybrook). Lane closures with speed reduced to 50mph through the work zone. Otherwise posted speed is 70 mph. All work will be performed from 7am to 6pm. Please drive with caution, reduce your speed and obey all posted traffic signs.
last updated
2009-11-03 07:53:13.887 MST
|

Roadwork
-
US 491
U_S 4_91 Northbound and Southbound from mile marker 15 to mile marker 29, 1 mile South of Buffalo Springs.
Title:
U_S 4_91 Northbound and Southbound from mile marker 15 to mile marker 29, 1 mile South of Buffalo Springs.
Description:
Roadwork on US 491, mile marker 15-29 (From Jct. US 491/NM 264 at Yah-ta-Hay to South of Buffalo Springs). Speed reduced to 55 mph through project limits and 45 mph through the work zone. Roadway reduced to one lane in both directions. Flaggers and pilot car will guide traffic through the work zone. All work will be performed from 7am to 5pm Monday through Friday. Please drive with caution, reduce your speed and obey all posted traffic signs.
last updated
2009-11-03 07:53:13.887 MST
|

Alert
-
US 491
US 4_91 Northbound and Southbound from Newcomb to Little Water.
Title:
US 4_91 Northbound and Southbound from Newcomb to Little Water.
Description:
US 491, mile marker 59-67 (From Newcomb to Little Water). Currently no impacts to traffic. All work being performed on Northbound right-of-way. Watch for equipment. All work will be performed from 7am to 6pm Monday through Friday. Please drive with caution and obey all posted traffic signs.
last updated
2009-11-03 07:53:13.887 MST
|